I'm a lead structural engineer with 14+ years of experience in design and analysis of Civil Structures including PT T Girder bridges, Box Girder Bridges, Steel Truss Railway bridge, RC and Post Tensioned Concrete Structures, Lifting of heavy Precast Slab, Strengthening of Existing Structures, Temporary Works (Scaffolding, Falsework, Formwork) Design , Installation Engineering of Offshore Structures during working  with various projects across gulf, Asia and Europe. I am presently working with Ramboll India as Lead Engineer -bridges & civils and responsible for leading a team of engineers to deliver detail design of bridge infrastructure for Danish Clients, assuring quality control in deliverables, coordination with clients and training to junior engineers. I have graduated with B.Tech -M.Tech dual degree in Civil (Structural) Engineering from IIT Kanpur. I am passionate about innovation, solved complex engineering problems. i am a quick learner, and have been appreciated for excellence in work by Client/Employer. I am also member of Institue of Engineers (India). I have developed online learning and sharing knowledge platform www.scaleupmyskill.com to promote civil engineering learning among students and graduate engineers.

profile picture-dec 2019.jpg

ALOK TOMAR

LEAD -BRIDGES & CIVILS  ( RAMBOLL)

B.Tech, M.Tech (Civil Engineering), IIT Kanpur

 

Phone:

91-9769347543

 

Email:

alokstiitk@gmail.com 

 

Address:

A504, City Apartment, Aditya world city, Ghaziabad

​

Date of Birth:

July 18th, 1987

​
EDUCATION
EDUCATION
2009-2010

M.TECH ( CIVIL ENGINEERING)

INDIAN INSTITUTE OF TECHNOLOGY (IIT) KANPUR

Program : B.tech- M.Tech Dual Degree Program

Specialization :  Structural and Earthquake Engineering.

CPI : 8.0/10

2005-2009

B.TECH ( CIVIL ENGINEERING)

INDIAN INSTITUTE OF TECHNOLOGY (IIT) KANPUR

Program : B.tech- M.Tech Dual Degree Program

CPI : 6.8/10

EXPERIENCE
EXPERIENCE
2023-PRESENT

 Lead Engineer -Bridges & Civils

​

RAMBOLL INDIA

Responsibilities:

  • Leading team of engineers to deliver project of bridge design for clients in Denmark,
    Training to graduates, maintaining quality in deliverables, assisting Project Manager, Coordination with Team members and clients.

Key Project Works:

  •  Independent Review of Detail Design of 2 spanned post tensioned T girder/slab deck bridge under project E45 -Gesagervej ,ɸstbirkvej, Vestvejen, Korningvej and Radvadvej in Denmark for Contractor VD. (2023)

  • Performed capacity Assessment of existing underground Arch shaped Tunnel beneath railway track, Existing railway bridge overpass supporting 3 railway tracks under project Aarhus ( Denmark). (2023)•

  • Reviewed of capacity Assessment of superstructure of existing railway bridge supporting single track for project Fiskebaevrej. ( Denmark) (2023)

  • Quality assessment for detail design drawings for bridges for project E45 package 6090. (2023)

​

2012-2023

 Design Engineer level -I(2016-2023)

 Design Engineer level -II(2013-2016)

Graduate Engineer (2012-2013)

​

​

​

TONY GEE AND PARTNERS MIDDLE EAST LLC (ABU DHABI)

Responsibilities:

  •  Structural Design calculations,  Analysis and review of Bridges, Special Structures, Temporary works as per International Standards ( BS, Euro, US)

  • Preparation of design reports and other design documents.

  • Preparation of Proposals, forecasting of time and resources requirement.

  • Coordination with Clients/ Contractors/ Sub Consultants/Project teams.

  • Monitoring of Project progress, regular reporting to PE/Director

  • Ensuring Project Quality -Project Design Review, Information management for Auditing.

Key Project Works:

  • Performed longitudinal and transverse analysis of deck, Global model- construction stage analysis and detail design of superstructure and substructure elements of Cable Stayed Iconic Shunya bridge at Vakola Nala crossing for project Mumbai Metro line 2B, Mumbai (India).

  • Category 3 Check of Retaining wall for Excavator and crane loading for the project HS 2 ,UK.

  • Detail design of Steel chord brace node connections, Bolted Splice connections, Bracing connections for Airport roof truss for project Hong Kong Airport T2 terminal, Hong Kong. 

  • Developed manual calculations spreadsheet for strength and fatigue check of the chord -braces joint of the steel railway bridge as per AREMA code for the project Etihad Rail (UAE)

  •  Reviewed structural design of Steel Gantry for support of Cast in Place Superstructure of the Bridge for Project Expo link (UAE).

  •   Designed superstructure and substructure elements of two cell box girder bridge for the project IC52A -RA/256 Kuwait

  • Performed Category III design check for lift of 860 MT precast slab of Nuclear Power Plant of Project Hinkley (UK) .

  • Designed steel Mothergrid and its connection for Yas Arena Project (Abu Dhabi), developed automated spreadsheet for hanger verification and detailed report for rigging manual

  •  Developed design spreadsheet for steel composite bridge deck and performed detailed design check of two-span temporary bridge for project Kuwait RA/256 . 

  • Formulated specifications for in-situ tests and performed detailed structural assessment and strengthening works for existing structure of Dubai Mall to support new Retail and Road Bridges as part of Dubai mall extension project.

  • Reviewed erection stresses of post tensioned concrete segmental bridge and ramp as part of CAT-III check, by developing a detailed FEA model and carried out construction stage analysis for Kuwait Bridge RA-186B project. 

  •  Designed a temporary Grandstand for extra seating capacity and Screen wall at Al Ahli Stadium at Dubai for Client – Gulf Arena.

  • Performed third party design check and certification for miscellaneous falsework and formwork of bridge pier head for EXPO 2020 at Dubai.

  • Performed third party design check certification for bridged access platform, façade scaffolds, beam and slab table formwork, climbing platforms, columns and wall shuttering for One Zabeel, Mobility Pavilion and Dubai hill mall project.

  • Designed falsework and formwork arrangement for concrete bridge deck casting and assisted in third party approval for the Project- Parallel Road at Dubai.

​

​

2012-2012

Offshore Structural Engineer

TECHNIP KT INDIA ( MUMBAI)

Responsibilities

  • Structural design of offshore platform.

  • SACS Analysis for In place and Fatigue check of Offshore Steel platform .

2010-2012

Executive Engineer

LARSEN & TOUBRO LTD(MUMBAI)

Responsibilities:

  •  Engineering support for Installation of steel platforms,

  • SACS analysis for lift, upend and on-bottom stability .

  • checking of stickup length of piles.

  • Inspection of fabrications and load out of piles at MFF Hazira yard.

Key Project Works:

  • Enabled economical method to upend long steel piles by free fall on sea by developing a FEA program to predict motions, forces and stresses in pile during dynamic upend operation for project Zawtika at Myanmar Sea.

  • Analyzed offshore structures for lift, launch, upend and on-bottom stability during installation in sea environment using SACS software and reviewed the installation design reports from L&T Valdel for MHN and MHNRD Project.

​

CLIENTS
CLIENTS
ALEC.GIF
BAM.GIF
GALDARI.GIF
DBB.GIF
Expo 2020.GIF
SKILLS
ALEC.GIF
BAM.GIF
GALDARI.GIF
DBB.GIF
Brook Field Multiplex.GIF
Afcons.GIF
Expo 2020.GIF
SKILLS

MIDAS CIVIL

SACS

LUSAS 

SOFISTIK

AUTO CAD

FINITE ELEMENT METHOD

EXPERTISE
EXPERTISE
BRIDGES

Detail Design and Review for -

  • PT Ribbed girder bridges.

  • PT Box girder(CIP, Segmented) Road Bridge Design.

  • Steel Truss Rail bridge -Strength, Fatigue design.

  • Steel Concrete Composite deck design.

  • Superstructure and substructure design.

  • Longitudinal and Transverse Analysis.

  • Tendon Arrangement design.

  • Detail design of Bridge elements .

  • Construction Stage analysis.

  • Steel Connection Design

SPECIAL STRUCTURES
  • Arena Mothergrid design and Rigging Manual.

  • Grandstand structural design.

  • Scoreboard structure and subframe design.

  • Lightening Supports design.

  • RC Car Park Assessment and Strengthening .

  • Airport and Metro Steel Roof Design .

  • PT Slab design and review.

  • Carbon fiber Strengthening .

  • Polymer section design.

TEMPORARY WORKS
  • Scaffolding design

  • Falsework and formwork design.

  • Back-propping design of existing Podium slab for Heavy crane movement.

  • Burried Pipeline Check for Crane loads

PROJECT ENGINEERING
  • Concept Engineering.

  • Detail Engineering.

  • Proposal Preparation

  • Forecasting of Resources.

  • Coordination with Clients/Team

  • Project Progress Monitoring and control.

  • Project Quality 

RECOGNITIONS
Recognition

Received honorary Memento from Indian Institute of Bridge Engineers (IIBE) for presentation on Cable stayed bridge in Mumbai

Memento.jpg

Received Iconic Award from Larsen & Toubro Ltd for developing FEA based FORTRAN program DYNUPEND and solving dynamic stresses in steel pile during dynamic upend operation in deep Sea.

ICON.jpg